Control Card (Order) for Landscaping Disturbance: Issuance Procedure
An extremely common mistake among business owners is the belief that having an approved facade passport automatically gives the right to immediately bring construction crews to the site and start installation work. From a legal point of view, the passport only approves the architectural concept and materials. To directly carry out works involving the installation of scaffolding, protective fencing, storage of building materials on the sidewalk, or earthworks for arranging an entrance group, it is necessary to obtain a special permit document — a control card (order) for the temporary disturbance of landscaping and its subsequent restoration.
In the capital of Ukraine, the issuance of this document is handled by the Department of Urban Landscaping of the executive body of the Kyiv City Council, and the direct processing of applications is assigned to the municipal enterprise “Kyivblagoustrii” or the Department of Territorial Control of the City of Kyiv. The control card records the very fact of the legality of builders being on municipal land and guarantees that after the completion of the work, the territory will be brought to a proper sanitary and technical condition.
For the legal issuance of the order, the applicant must collect and submit the following document package: An official letter of appeal addressed to the director of the specialized Department of Territorial Control. Attached to the letter is an application for obtaining a control card, which meticulously specifies the technical characteristics of the object, exact real estate address, name of the contracting organization (the company that will directly perform construction and installation works), its bank details, and the contact information of the official who will bear personal responsibility for compliance with safety and landscaping rules during the works. A mandatory point is indicating precise calendar deadlines within which the works will be guaranteed to be completed. Additionally, copies of documents confirming the applicant’s identity and the already approved facade finishing passport are provided.
The submission procedure is maximally simplified: documents can be transferred through physical correspondence boxes located in the premises of specialized departments (for example, in Kyiv on Dehtiarivska or Bohdan Khmelnytskyi street), sent to the designated email of the agency, or submitted via the Unified State Web Portal of Electronic Services “Diia” or a local ASC. The standard review period for submitted documents by officials is up to seven working days, after which an official decision on issuing the control card is made.
Direct construction and installation works on finishing the facades of a building or structure are allowed to be performed exclusively after receiving the control card for temporary landscaping disturbance from the local self-government body. A special case is the occurrence of emergency situations (for example, the collapse of a part of the cornice) that threaten the lives of citizens. In such extreme situations, liquidation works can be started immediately without an order, but the law requires mandatory written notification to controlling inspections about the fact of starting work within twenty-four hours.
After the complete finishing of the facade repair and dismantling of scaffolding, the final stage comes — the restoration of the landscaping of the adjacent territory. The contractor is obliged to restore the damaged asphalt pavement, relay the paving stones, and restore the lawns. Only after checking the quality of these works by an inspector is the control card subject to mandatory documentary closure, which means the successful and completely legal completion of the reconstruction project.