Ukraine’s Roof Design Standard DBN V.2.6-220:2017: Falls, Drainage and Details

Ukraine’s building standard DBN V.2.6-220:2017, Roofs of Buildings and Structures, covers roofs with internal or external drainage. Start a project review with three drawings: the falls and catchment plan, a roof assembly section and the junction details. Together they should show where rainwater goes, how the layers are arranged and how the waterproofing continues around interruptions. For a project in Ukraine, check the active record in the official register.

What the Ukrainian roofing standard covers

The document addresses flat and pitched roof assemblies, materials, roof junctions, drainage, equipment and safety. An owner can use these sections to commission and review a drawing set. The design team identifies which requirements apply to the building, the scope of work and the roof system. The examples below use metric dimensions and can help an overseas client read Ukrainian project documents. Local requirements take precedence for work outside Ukraine.

Project question Where to look What to request
Is it a flat or pitched roof? Sections 5 and 8 A section and a description of the roof’s intended use
How are junctions detailed? Section 7, clause 7.2.6 and Appendix Г.2 A layer-by-layer detail at parapets, walls and penetrations
Where does the rainwater go? Section 10 Catchment boundaries, outlet levels and a drainage calculation
How does the movement joint stay watertight? Section 9 A detail showing how it accommodates design movement
How can staff maintain the roof? Clause 7.1.3 and Section 14 Access routes, inspection points and the safety measures

The archived register entry with searchable text is convenient for locating clauses. Check the active register entry for status, and obtain the version that applies to the project.

Roof falls and the path to an outlet

On a roof plan, trace each catchment boundary, its slope arrows, low points and outlets. Lay this plan over the latest mechanical equipment layout. An upstand built across a flow line can create a pocket of standing water beside a service penetration. If the equipment location changes, the designer should review levels and drainage in that zone before the waterproofing goes in.

Percentage fall equals vertical difference divided by horizontal run, multiplied by 100. A 90 mm drop over 6 m is 1.5%, which illustrates how to read the plan. The 1% in clause 10.2 applies to valleys leading to internal roof drains under that clause. Check the applicable requirements and the roof-system specification for the rest of the roof.

Two catchment areas of 100 and 80 m² and rain volume for each.
Two catchment areas of 100 and 80 m² and rain volume for each.

Worked example: two catches on a 180 m² warehouse roof

Suppose two catchments measure 100 and 80 m² and drain through separate outlets. If 20 mm of rain falls evenly and all of it runs off, the two zones deliver 2,000 and 1,600 litres, or 3,600 litres in total. This illustrates event volume. Selecting an outlet requires a design flow rate, rainfall intensity, a network layout and the outlet’s rated performance. An obstruction or a blocked outlet may also change where rainwater collects, especially if two branches join downstream.

For an internal gravity system in Ukraine, clause 22.1.12 of DBN V.2.5-64:2012 includes 30% of the area of qualifying adjoining wall surfaces that rise above the roof. For an 80 m² roof catchment and a qualifying 30 m² wall this gives 89 m² of design catchment. The Mehbud catchment calculator in Ukrainian prepares this input for the next design stage.

Flat and pitched roofs: where to look first

On a flat roof, trace the waterproofing layer from a high point to the drain and up at the perimeter. A section should show the deck, insulation, air and vapour control layers as applicable, membrane and the connection to the outlet. A paved terrace also needs a path under the finish for water and practical access for drain cleaning.

On a pitched roof, follow runoff from the ridge down to the gutter. Check valleys that concentrate water, then look at the eaves and interruptions such as a chimney or roof window. A drip after a cold clear night suggests a different line of inquiry from a stain that appears during wind-driven rain. See how to distinguish condensation and a roof leak.

Checks to make on flat and pitched roof drawings.
Checks to make on flat and pitched roof drawings.

Parapets, roof drains and penetrations

At a parapet, identify how the membrane turns up, how it is terminated and where the coping sheds water. For roll or mastic waterproofing, see clause 7.2.6 and the example in Appendix Г.2. If the façade has a ventilated cavity, review the top of the rainscreen and its ventilation gap alongside the coping, membrane and attachments.

At an outlet, find the connection between waterproofing and the drain body, and check whether the drain can be reached to clear debris. At a penetration, confirm the upstand, materials and waterproofing connection against the project detail. A movement joint needs to remain watertight over the movement range specified by the design team. These details benefit from review while the connections are still accessible.

Handover and winter maintenance

  1. Compare installed outlets, penetrations and equipment with the coordinated drawings.
  2. Capture photographs of concealed layers and wall junctions. Keep system manuals and the material schedule with the handover documents.
  3. Confirm the agreed method for checking waterproofing and local ponding, according to the project and system guidance. Record who owns each defect and its deadline.
  4. Assign seasonal drain, gutter and coping inspections. Arrange safe access for inspections after leaf fall, freeze–thaw events or storms.

The Ukrainian design team also checks snow, wind and other actions under DBN V.1.2-2:2006, thermal insulation under DBN V.2.6-31:2021 and fire provisions under DBN V.1.1-7:2016. The related roof edge protection guide covers guardrails, parapets and the thresholds that apply in Ukraine.

Frequently asked questions

Can an outlet be selected from roof area alone?

Use the area with the design rainfall intensity, performance figures for the outlet and the layout of the drainage system. Identify the relevant catchment before asking a supplier to recommend a component.

What does the metal parapet coping do?

It sheds water from the top of the parapet. The drawing should also show the membrane termination, joint detailing, attachment and the closure at the top of the façade.

How can I make two roofing quotes comparable?

Send the same drawings and the same list of details to every bidder. Mark the point at which the contractor’s work connects to the stormwater system. Ask for separate line items for concealed work, junctions, penetrations, coping and acceptance checks. A quotation with these items makes scope gaps easier to find.