Certification of construction products in Ukraine: what documents to check

When purchasing construction products, verify the exact product model, its intended use, and its performance characteristics against the requirements of your project. For products covered by a national standard for the purposes of Law No. 850-IX or for which a conclusion on technical suitability has been issued, the manufacturer generally draws up a declaration of performance. The need for a separate certificate depends on the product, applicable requirements, and the assessment system.

Panel width and component compatibility can be checked upon acceptance. Assessing reaction to fire, corrosion resistance, or fastener strength requires declared characteristics, test reports, or design calculations, depending on the indicator. Let’s break down what to request before ordering and what to verify upon delivery.

When a declaration of performance for construction products is required

A declaration of performance is a document in which the manufacturer states the essential performance characteristics of a specific type of construction product and assumes responsibility for the declared values. Article 5 of the Law of Ukraine No. 850-IX defines when a manufacturer draws up a declaration and under what conditions exemptions apply. Custom product dimensions alone do not constitute grounds for an exemption.

Ask the supplier which standard or conclusion on technical suitability was used to assess your product and for which intended use. If national standards for the purposes of Law No. 850-IX do not cover the product or cover it only partially, check the applicable requirements under the procedure for applying national standards, approved by Cabinet of Ministers Resolution No. 1348.

Systems for assessment and verification of constancy of performance, approved by Cabinet of Ministers Resolution No. 596, determine who carries out the assessment. Depending on the system, a designated body may certify the constancy of performance or factory production control, while a designated laboratory assesses performance. In some systems, the manufacturer performs these tasks without third-party involvement.

What documents to request from the manufacturer

Clarify what exactly each document confirms. This makes it easier to compare offers, even when suppliers use different names for their document packages.

Document What to check
Declaration of performance Manufacturer, product type, intended use, standard or conclusion, and the performance characteristics required for the project.
Certificate Issuing body, scope of coverage, certification scheme, and validity. If there is an appendix listing models, verify it.
Test report Tested sample and its configuration, test method, obtained result, and limits of its applicability.
Quality certificate or batch document Batch number or other identifier, characteristics of the supplied material, and match with the labeling.
Warranty terms Which defects are covered by the warranty, for what period, under what installation and maintenance conditions, and how to submit a claim.

If the supplier provides an ISO 9001 certificate, verify the organization’s name and the scope of certification. This standard sets requirements for a quality management system, whereas steel thickness, coating characteristics, and finished product performance are verified using documentation for the material and the product itself.

How to verify a declaration or certificate online

  1. Request a copy of the document and its registration number. For a declaration drawn up in EDESSB, also ask for a direct link to the record. On the portal, open the register of declarations of performance for construction products.
  2. Verify the status and details. Compare the registration number, manufacturer, product type, and intended use against the provided document and order specification. If the record cannot be found, ask the supplier to send a link or explain under which procedure the document was issued.
  3. Check the required characteristics. Match the values or classes against project requirements. The mark NPD means that no performance is determined. If that characteristic is required for your project, agree with the designer on what confirmation needs to be obtained.
  4. Verify the certificate separately. Use the register of the issuing body, if available, or contact that body directly. Check the scope and validity of the document for the specific product.

The clarification by the State Inspectorate for Architecture and Urban Planning outlines the information that must appear in the declaration and marking. Cabinet of Ministers Resolution No. 1458 provides the standard declaration form and instructions for completing it.

What to check for a facade, ceiling, and fence

Metal cassettes for a ventilated facade

Request the specification for the cassettes and coating, installation instructions, and detail drawings. Coordinate the substructure, fasteners, and wind loads with the designer, taking into account the building height and facade zones. If the project includes fire safety requirements, check whether the document applies to an individual panel, the coating, or a specific assembled system. The reaction-to-fire class of a single material and the fire resistance of a structure describe different properties.

On the facade of the 7 Ocean Aquapark in Khmelnytskyi, Mehbud cassette and linear profiles custom-manufactured to project dimensions were used. For a similar order, provide the manufacturer with the facade layout and coating requirements. This helps verify the quote against the project specification before production starts.

image.png 9805e84b
Examples of metal structures made from Mehbud materials. The certificate in the center of the collage is shown as an archival illustration.

Suspended metal ceiling

Request a layout diagram listing compatible slats or cassettes, carrier profiles, and hangers. Verify the permissible configuration, fastener spacing, and method for installing light fixtures and MEP equipment. If acoustic or fire safety requirements are specified for the room, check which exact configuration the stated performance values apply to. For example, changing the perforation or acoustic inlay can affect the result.

Metal fence

Specify the slat profile, base metal thickness, coating, and section height and width in the order. Coordinate the post and fastener types for the site. For a tall fence in an open area, check how the posts, foundation, and sections will perform together under wind load. Before paying, clarify the warranty terms for metal and metal products, particularly regarding corrosion, coating, and installation.

Checklist before payment and acceptance

  1. Before ordering, provide the supplier with the specification, intended use of the products, operating conditions, and project requirements.
  2. In the contract, specify the model, material, coating, scope of supply, agreed tolerances, and list of accompanying documents.
  3. Upon delivery, verify packaging labels and available batch identifiers against the delivery note. Check quantity, component geometry, edge condition, and coating.
  4. Before installation, take photos of any damage and discrepancies in the delivery scope. Keep the labeling, delivery note, and instructions in case of a future warranty claim.
image.png 3f414ae7
Upon acceptance, check the products against drawings, specifications, and batch labeling.

Frequently asked questions

Must every construction material have a certificate?

The list of required documents is determined by the product type, its intended use, and applicable requirements. When a declaration of performance is required under Law No. 850-IX, it is drawn up by the manufacturer. Third-party involvement depends on the established assessment system.

Where can I verify a declaration of performance for construction products?

For declarations drawn up in EDESSB, request the registration number and a link to the record in the public register. Verify the status, manufacturer, product type, and intended use against the shipping documents.

Is a metal certificate sufficient for a finished panel?

A document for the metal confirms the raw material characteristics stated in it. For a finished panel, additionally verify its geometry, coating, fastening method, and confirmation of the performance characteristics required by the project for the finished product or system.

What does NPD mean in a declaration?

It stands for “No Performance Determined” for a given characteristic. If material selection depends on that characteristic, ask the designer to specify the required level and agree with the supplier on how to confirm it.

What should I do if a supplier shows an old UkrSEPRO certificate?

Check its expiration date, scope, and product model, and request up-to-date documents for the specific delivery. If a declaration of performance is required, verify it separately using the manufacturer’s details.